Hilltop House Construction Progress April 2021

We purchased our hilltop wooded lot over a year ago and the project was delayed so much that we didn't think it was ever going to happen for us. 

We drove by the lot during our weekly errands in early March and still, nothing. 

On March 20, 2021, out of curiosity we again drove by the lot. To our great surprise, it looked like something was happening! We had ourselves a pit!!!


Five days later on March 25, the foundation was laid. The builder surely didn't waste anytime after they secured the building permit for us. Picture below, this is the side that's going to support our garage. We love that our basement will have high ceiling (9.5 - 10 feet) just like the floors above (ground and second floors 10 feet, third floor 9 feet). 

This is from the other side where we will have a bay window above. 

Looks like we will have a few steps leading up to our front portico, according to our grading. I am guessing at least 6 steps based on the slope. 

April 2, 2021: foundation is still curing. Waterproofing membrane was installed. 